Loading Events

« All Events

  • This event has passed.

Schaeffer Bridge Build – The Final Push!

August 19 @ 9:00 am - 1:00 pm

This bridge build has taken longer than anticipated – but I am hoping a good crew on Sunday can get the railings and decking completed!

As a precursor to the new Yellow Trail re-route we need to build a new bridge! This will be a 20′ bridge built to the new deigns we had engineered and approved for bridges on MD DNR land – so this thing will be STRONG!!

If you have some basic carpentry skills (mostly nailing!) that will be great – but no specific experience is really required. All material is already at the build site and all necessary tools will be provided.

For more information feel free to reach out to me: bob (at) thecaverlys (.) net

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Details

Date:
August 19
Time:
9:00 am - 1:00 pm
Event Category:
Event Tags:
,

Organizer

MORE
Website:
http://www.more-mtb.org/

Venue

Schaeffer Farm
14800 Schaeffer Rd
Boyds, MD 20841 United States
+ Google Map

RSVP

If you plan on attending please let us know by providing your email address.